Sodick Begins Construction of New U.S. Headquarters
The larger facility will be located in Schaumburg, Illinois.
Share



Machine tool manufacturer Sodick Inc. and its partners, the City of Schaumburg, Northern Builders and Harris Architects, have announced the beginning of construction on Sodick’s new U.S. corporate headquarters in Schaumburg, Illinois. The new 40,000-square-foot facility is to be constructed on a 5-acre lot and is scheduled be completed July 2017.
The new corporate headquarters will nearly double Sodick’s facility space and will include an additional loading dock to better accommodate increased sales volume. Additionally, the facility will have an expanded EDM showroom, engineering bay and a dedicated additive manufacturing technology center to house Sodick’s OPM line of metal 3D printers.
Related Content
-
Hybrid Control Makes Lights-Out EDM More Accessible
This CNC enables EDMs to switch between G-code and an integrated CAM system to adapt to changing conditions and make lights-out manufacturing more attainable.
-
MC Machinery EDM Offerings Provide Optimized Performance
MC Machinery’s Mitsubishi SG12 and MV2400 EDMs provide ergonomic and efficient operations.
-
EDM Network Wire EDM Features Four-Axis Cutting
The EDMMax 434W fast-wire EDM includes four-axis cutting capability that enables it to cut 3D support structures or other shop-related parts.