Arc Welding Robot Track Withstands Harsh Environments
Güdel introduces ArcTrack, a flexible, pre-configured robot track motion module for arc welding applications that can reduce lead time by as much as 40 percent, according to the company.
Share




introduces ArcTrack, a flexible, pre-configured robot track motion module for arc welding applications that can reduce lead time by as much as 40 percent, according to the company.
The pre-engineered TrackMotion Floor (TMF-2) configuration has an auxiliary shelf that can carry welding equipment, large wire spools, and torch cleaning and reaming devices with the robot. The shelf is said to be able to support over 750 kg without compromising performance. The module includes robot-specific gear boxes, motors and cables. It is available for arc welding robots from companies including FANUC, ABB, Motoman and Kuka.
All of the company’s units are designed and engineered for harsh environments, including welding, painting, die casting, foundries, sealing, machining and grinding. A cam follower and cartridge-bearing design is said to enable 15-min. MTTR for bearing replacement. The module is configured with guideway scrapers and a fully enclosed e-chain for a final layer of protection.
All of the company’s robot track motion modules are available in lengths from 3 to 100 m and can be equipped with robot risers from 50 to 600 mm.
Güdel Inc. | 734-214-0000 |
Related Content
-
Setting Up the Building Blocks for a Digital Factory
Woodward Inc. spent over a year developing an API to connect machines to its digital factory. Caron Engineering’s MiConnect has cut most of this process while also granting the shop greater access to machine information.
-
Using the Toolchanger to Automate Production
Taking advantage of a feature that’s already on the machine tool, Lang’s Haubex system uses the toolchanger to move and store parts, making it an easy-to-use and cost-effective automation solution.
-
Medical Shop Performs Lights-Out Production in Five-Axes
Moving to five-axis machining enabled this shop to dramatically reduce setup time and increase lights-out capacity, but success relied on the right combination of workholding and automation.